April 15 Construction Update


? Work is currently moving to the area behind BT and near the welding/auto body shop.

? The back two doors of the BT building and the parking lot between IT and the welding/auto body shop are closed for the time being.

? There will be no through passage between IT and the Whatley Center for approximately two more weeks.

? Please use caution on that entire side of campus and look out for heavy machinery and workers.


Helen Hampton sponsors Pinkalicious

Helen Hampton (center) sponsored the April 3 performance of the popular children?s musical ?Pinkalicious" at the Whatley Center for the Performing Arts at Northeast Texas Community College. She is pictured with cast members at the VIP Tea Party with Pink held after the show. ?Pinkalicious" marked the end of the Whatley Center?s 2015-2016 season. The lineup for next year?s shows will be announced this summer.
Tags

Jessica Velazquez published in TSHS journal

Northeast Texas Community College Presidential Scholar, Jessica Velazquez, was recently published in the 2016 issue of a statewide academic journal.†Touchstone, the annual publication of the Texas State Historical Society, chose Velazquez?s essay†?Farm Life in Transition? as one of the collegiate articles featured this year.

Her essay surveys agriculture in five counties in Texas from 1930 to 1960: Brazoria, Denton, Hidalgo, Lubbock, and Titus.† Even with each county representing a different section of Texas agriculture, Velazquez found some important similarities.

Student Art exhibit planned

The Northeast Texas Community College Art Department will hold its annual student art show April 13-27 in the foyer gallery of the Whatley Center for the Performing Arts. The exhibit will feature student work in photography, painting, ceramics, digital artwork, drawing and design. An artist reception will be held Tuesday, April 19 in the Whatley Center foyer at 2 p.m. The exhibit is open to the public Monday through Thursday from 9 a.m. to 4 p.m. and Friday from 9 a.m. to noon. Please call 903-434-8181 to ensure the gallery is open before visiting.

Construction update April 7


    \t
  • There is now a walkway connecting the BT/IT buildings and the Whatley Center. However, please continue to use caution in this area as construction on the underground loop continues.

  • \t
  • You can follow the construction progress online at†www.ntcc.edu/construction.


Plan Ahead! The entire parking lot behind UHS around to the SUB†will be closed May 16 to June 4†as they work to install a new drain system.†